From: route@monster.com
Sent: Thursday, January 28, 2016 5:16 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Sean J Wood Kent, WA 98031 Cell:
253-249-5167 Home: 253-639-4420 Summary of Experience
EMPLOYMENT HISTORY: 10/7/2012 to 9/25/2014 Cannon Construction, Inc. Milton, WA 98354 Project Manager/ Estimator Materials/Labor pricing and project bidding
8/30/2011 to 8/17/2012 Teknon Corp. Redmond, WA 98052 ITS Project Manager/ Estimator Materials/Labor pricing and project bidding
1/09 to 8/30/2011 Signal Electric Inc. Kent, WA Technical Services Manager/ Estimator Materials/Labor pricing and project bidding
2/01 to 12/08 Lane Communications Inc. 2/00 to 2/01 Prince Telecom Auburn, WA
12/99 to 2/00 Lander Electric Bellevue, WA 6/99 to 12/99 Quik Wire Electric Auburn, WA 4/96 to 5/99 Iowa Department of Corrections Clarinda, IA 11/93 to 4/96 Nebraska Department of Corrections Lincoln/Omaha NE PROJECT EXPERIENCE: 2006 City of Issaquah ITS project: Installation of Fiber optic interconnects
switchgear and cameras. Project contact: Fay Shafi 2007 City of Tumwater ITS/ WSDOT ITS Installation of Fiber optic interconnect
and switchgear Project Contact: Todd Turner WSDOT 2007 WSDOT Design Build I405 Kirkland Installation of Fiber optic Trunk and
Distribution cables, switchgear and cameras Project Contact: Kiewit Construction 2007 WSDOT Hot Lanes Pilot Project: Installation of Fiber optic Trunk and
Distribution cables, switchgear and Cameras Project Contact: Mark Sawyer WSDOT Special Recognition from WSDOT/AGC for
participation in the project 2008 WSDOT I-5 Everett Freeway
Station Installation of Fiber optic Trunk and
Distribution cables, switchgear and Cameras 2009 WSDOT I-5/Boeing Access Rd Installation of Fiber optic Trunk and
Distribution cables, switchgear and Cameras 2010 WSDOT SR599/SR509 1st Ave to 112th St Installation of Fiber optic Trunk and
Distribution cables, switchgear and Cameras 2011 WSDOT I-5/SR18 Interchange
Improvements Installation of Fiber optic Trunk and
Distribution cables, switchgear and Cameras 2012 WSDOT US2 Interchange
Improvements Installation of Fiber optic Trunk and
Distribution cables, switchgear, Highway Advisory Radio and Cameras 2012 WSDOT Lundeen Parkway Installation of Fiber optic Trunk and
Distribution cables, switchgear and Cameras 2012 Port of Tacoma TWIC and Fiber
Backbone Installation of Fiber optic Pre-Terminated
Patch panels, Wireless System and Cameras 2012-2014 UCPAC2 Hawaii, Ft. Shafter, Wheeler
AAF & Schofield Barracks Installation of OSP fiber optic cable,
Design and Survey. TECHNICAL SKILLS SUMMARY: Electrical Theory and NEC Code
Certification through CITC @ PLU Accubid Pro 10 Software Exfo Fastreporter Software AutoCAD Microsoft Word, Power Point, Excel,
Outlook, Onenote and Project Timberline Project management software Quickbooks Heavy Bid Spectrum
EXFO Fastester Power Meter Fujikura 50S/50R Fusion splicer Fujikura 60S Fusion splicer |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|